Checklist for running 9 5/8" casing

Checklist for running 9 5/8

 

Wear Bushing

 

Pull Wear Busing

 

Casing

 

Tally Casing

 

 

 

Pre-Install Float Shoe & Collar

 

Casing Equipment

 

Tongs…

Checklist: Driling 12.25" section

Checklist: Driling 12.25

  • Test plug ready
  • Install wear bushing
  • Float valve installed
  • BHA on racks and strapped
  • Stabilizers, jars strapped and ready to RIH. Check jar hours
  • Bits, nozzles, tools and breaker on location
  • Bit…