13.3/8 " Casing Running Programme

1. Voor running casing een veiligheids meeting waarbij alle betrokkenen aanwezig zijn. Vermeldt in Dagelijks rapport.

R/U om casing te runnen.

2. Make up & pipelock shoetrack volgens de running…

Loadout List for Casing Operations

Loadout lists for 30", 20", 13 3/8", 9 5/8", 7" casing operations

Mandrel Casing Hangers

This article describes the mandrel casing hanger make-up and running proedures.

Mandrel Casing Hanger Make-up

The “total” hanger will consist of:

  • bottom pupjoint
  • MCH (Mandrel Casing Hanger)
  • top…

Procedure For Running 30” Conductor

Preparation, planning and procedure for running 30" conductor.

Job Preparation

Note: Well must be drilled to depth.  Plan on top 30” conductor pipe being 1.285m down from top of cellar.  Do…